EX-024 · 建筑五金 · 模拟采购问题 B 中性模拟情境 · 非任何 AI 平台实测或自然引用 Buyer question / 采购问题 Before requesting a quotation for architectural hardware, what information should I prepare and what evidence should I ask the supplier to confirm? 中文解释 询价建筑五金前,采购者需要整理安装尺寸、荷载条件、材质、兼容性,并要求供应方说明依据。 Illustrative answer / 模拟回答 Prepare fitting dimensions, load conditions, material specification and compatibility drawings for the proposed order. Ask the supplier to identify missing details, explain how samples or tests would be checked where relevant, and confirm the quotation scope in writing. The simulated page is not an accepted order, proof of certification or a delivery commitment. 中文解释 准备安装尺寸、荷载条件、材质、兼容性等条件,另写明预计数量、目的地与可用图纸或样品。请供应方说明缺项、样品或测试确认方式及报价范围;询价和模拟回答都不等于订单或交付承诺。 对应网站资料 · 待核实 示意询价清单以安装尺寸、荷载条件、材质、兼容性为核对点;报价和实际证据须由供应方另行确认。 场景演示|非真实客户案例|AI回答为模拟示意 实际产品事实待供应方核实。